Project deliverables

Project deliverables

The nine project deliverables for QUEST are summarised in the table below. These are published in section 9 of the full submission proforma.

As these deliverables are completed, the associated learning will be submitted to Ofgem and published below on the dates specified.

 No.

 Deliverable Deadline Evidence Status / Revised Date

 1

 QUEST Initial Report - Use Cases

31/07/21

Document introducing the Project and detailing the use cases and scenarios.

Completed July 21

 2

 QUEST System Design and Architecture Lessons Learned

31/12/21

Document explaining Project progress including the following outputs:

  • Review of architecture options
  • Specification for the network models and modelling regime

Completed December 21

 3

 QUEST Trials, Design and Specification Report

30/06/22

Document explaining Project progress including the following outputs:

  • Functional specification for chosen architecture
  • Functional specification for voltage control methodology
  • Trial design
  • Detailed site design

Completed June 22

 4

 QUEST Interim Report - System Design and Technology Build Lessons Learned

30/06/23

Document detailing Porject progress to date including lessons learned from:

  • QUEST software development and testing
  • Power system modle development
  • Site installation for the voltage control and ANM equipment

Completed June 23

 5

 QUEST System Integration Lessons Learned Report

30/12/23

Revised Update: 30/04/24

Revised Additional IT update to be added

Document detailing the lessons learned from the installation and commissioning of the QUEST system including system integration and the results of site acceptance testing.

Completed December 23

Updated      April 24

Last IT update December 24

 6

 Customer Research Findings Report

31/10/24

Revised:

26/09/25

Document detailing the outputs from the customer research.

Completed September 25

 7

 QUEST Trials and Analysis Report

30/12/24

Revised:

28/11/25

Document detailing:

  • Final results from network trials
  • Final results from modelling trials
  • Output from the voltage demand relationship research
  • Any adaptation required to voltage control methodology

Completed November 25

 8

 QUEST Final Report

30/04/25

Revised:

19/12/25

Report on the conclusion of the QUEST Project including all the lessons learned and detailing the next steps, including BaU transition.

Completed December 25

 9

 Comply with knowledge transfer requirements of the Governance Document

End of Project

 

End of project

 

Initial report - use cases

First deliverable report

Read more

System Design and Architecture Lessons Learned

Second deliverable report

Read more

Trials, Design and Specification Report

Third deliverable report

Read more

System Design and Technology Build Lessons Learned

Fourth deliverable report

Read more

QUEST System Integration Lessons Learned Report

Fifth deliverable report

Read more

Customer Research Report

Sixth deliverable report

Read More

Trials and Analysis Report

Seventh deliverable report

Read More